日本高清不卡三区_日韩欧美高清一区二区_东北粗壮熟女丰满高潮_又大又硬又爽又黄A片哪里看_忍着娇喘人妻被中出中文字幕_中文字幕AV无码不卡免费

鴻鑫鋼丸,值得信賴!歡迎訪問武漢鴻鑫鋼砂鋼丸官方網(wǎng)站!

鴻鑫鋼砂鋼丸-生產(chǎn)廠家
線上銷量破萬噸 SSPC會員單位
18年研發(fā)經(jīng)驗
在線銷售專業(yè)品牌
鋼丸姐咨詢熱線400-038-8928
SSPC-PA17標(biāo)準(zhǔn) B3 鴻鑫鋼丸
2019-07-16來源:鋼丸姐點擊:2239次
[導(dǎo)讀]: 鴻鑫鋼丸是國家工商總局核名的,專業(yè)從事金屬磨料研發(fā)的的專業(yè)公司,不僅能為您提供制作精良的鋼丸、鋼砂除銹產(chǎn)品,更能從專業(yè)、科學(xué)的角度,根據(jù)您的實際情況為您制作專屬...

  鴻鑫鋼丸是國家工商總局核名的,專業(yè)從事金屬磨料研發(fā)的的專業(yè)公司,不僅能為您提供制作精良的鋼丸、鋼砂除銹產(chǎn)品,更能從專業(yè)、科學(xué)的角度,根據(jù)您的實際情況為您制作專屬的除銹方案。

  同樣鴻鑫鋼丸也是SSPC認(rèn)證的,所以我們是您**好的選擇!

  今天鋼丸姐和大家分享一下SSPC標(biāo)準(zhǔn)

  SSPC: The Society for Protective Coatings

  Procedure for Determining Conformance to

  Steel Profile/Surface Roughness/Peak Count Requirements

  B3 Additional Requirements for Process Changes

  B3.1 If there is a change to any of the items listed inTables B1, B2, or B3 (as applicable) during surface prepara-tion, the time that the change took place and the location ofthe surfaces or the identity of the pieces prepared before thechange shall be identified.

  B3.2 Unless otherwise specified in the contract docu-ments, two measurements shall be taken at randomlyselected locations on the prepared surface(s) of the struc-

  ture (or on a minimum of two of the prepared pieces) uponcompletion of surface preparation. One measurementshall be taken on the structure’s surface(s) prepared (or on

  one of the pieces prepared) before the process change.The second measurement shall be taken on the preparedsurface(s) of the structure (or on one of the pieces prepared)

  after the process change. The location of the tests, thetest methods used, the test results and whether the resultsconformed to contract requirements shall be documented.

  B3.3 If the process changes more than once duringsurface preparation, an additional measurement per the aboveprocedure each time the process changes shall be taken.

  B4 Non-Conforming Surface Profile:

  STEP 1: Determine location averages atregular intervals in four equally spaceddirections radiating outward from thenon-compliant 15 x 15 cm (or 6 x 6 inch)

  location. If there is no space to takereadings in a given direction, then noreadings need to be taken. Determineadditional location averages in each

  direction until two consecutive locationaverages are compliant in each directionor until there is no space to take additionalmeasurements in that direction. Determine

  a single location average on repeatingstructural units or elements of structuralunits until location averages on twoconsecutive units (or elements) in each

  direction are compliant or until there are nomore units or elements to test.

  STEP 2: Acceptable location averages are asdefined by the specification for minimumand maximum values. Use removablechalk or other specified marking material

  to identify the extent of the non-conformingsurface profile.

  STEP 3: Record the extent of the nonconformityusing readily identifiable structuralmembers or permanent structural details.

  NONMANDATORY APPENDIX C: Additional Consid-

  erations When Measuring Surface Profile

  C2.1 Determining Surface Profile/Peak Count onSurfaces Shop-Prepared Using Stationary CentrifugalBlast Cleaning Units: A centrifugal blast machine is

  comprised of one or more spinning wheels that throw abrasiveblast media at a conveyed part that moves parallel to the blastmachine. Various parameters, including dwell time and rate

  of travel, can affect the degree of cleaning and blast profileachieved. A key parameter that can affect the uniformity of theblast profile depth is the positioning of the adjustable wheels.

  Improperly aligned wheels may not achieve a uniform blastprofile because some areas could be partially or completelymissed. In some cases the blast media may strike the surface

  at an oblique angle resulting in a lesser profile depth. In orderto account for the potential variability in the surface profile,the profile should be measured at representative unique loca-

  tions. For example, U-shaped sheet piles have three uniquelyoriented surfaces on each side. Each of the three surfacesshould be evaluated for compliance to the specified blast

  profile separately. The values should not be averaged. If anyone surface is non-compliant, the machine should be adjustedand the piece reblasted and checked for compliance on each

  surface. The procedure should be repeated until the specifiedprofile is achieved. Caution should be exercised in re-blastingas steel surfaces can be compromised by over blasting causing

  surface failures in the grain structure of the steel surface.

  C2.2 Determining Surface Profile on Surfaces CleanedUsing Portable Centrifugal Blast Cleaning Units: A portablecentrifugal blast machine uses one or more spinning wheels

  that throw abrasive blast media at a surface as the blastmachine is moved parallel to the surface. Various parameters,including dwell time and rate of travel, can affect the degree of

  cleaning and blast profile achieved. A key parameter that canaffect the uniformity of the blast profile depth is the distributionof blast media across the width of the cleaned surface. Improp-

  erly distributed media may not achieve a uniform blast profilebecause some areas could be partially or completely missed.In order to account for the potential variability in the surface

  profile, the profile should be measured at representative loca-tions across the width of the blast path.

  C2.3 Determining Surface Profile on Surfaces CleanedUsing Waterjetting Units: Information about the surfacepreparation history and the effects of long-term exposure may

  not be available for previously coated surfaces that have beencleaned by water jetting. The newly exposed profile couldchange significantly within a small area. Therefore, it may be

  necessary to determine additional location averages of surfaceprofile or surface roughness and peak count to ensure that theprofile consistently meets the stated requirements.

  SSPC standards, guides, and technical reports are copyrightedworld-wide by SSPC: The Society for Protective Coatings. Any

  photocopying, re-selling, or redistribution of these standards,guides, and technical reports by printed, electronic, or anyother means is strictly prohibited without the express written

  consent of SSPC: The Society of Protective Coatings and aformal licensing agreement.

  C2.4 Determining Surface Profile on Surfaces Cleanedto SSPC-SP 15 or SSPC-SP 11: When power tool cleaningto SSPC-SP 15 or SSPC-SP 11, the designed service life of

  the cleaning media may end before the specified or defaultminimum surface profile required is achieved. The frequency

  of determining additional location averages of profile or surfaceroughness and peak count should be increased to reflect the

  productive life of the media being used. The designed servicelife of the power tool cleaning media used should be consideredwhen specifying the frequency for determining compliance.

  C2.5 Precautions Regarding Determination of SurfaceProfile

  C2.5.1 Determination of Surface Profile on Flame Cut

  Edges: When steel is cut using oxy-acetylene torches, theheat that is generated during the cutting process hardens thecut edge. This is known as carburization or case-hardening

  (surface hardening) of the steel. Subsequent abrasive blastcleaning of these surfaces will typically yield a shallower

  surface profile depth due to the increased hardness of thesurface. Removal of the hardened surface using grinders priorto abrasive blast cleaning will typically resolve the problem.

  Surface profile readings and location averages should beobtained in these areas to verify compliance with projectrequirements.

  C2.5.2 Effect of Existing Surface Profile on NewlyGenerated Surface Profile: Steel surfaces with existingcoating that must be removed may already have an existing

  surface profile. During surface preparation, the new surfaceprofile combined with the existing surface profile may exceedthe specified maximum surface profile for maintenance

  operations. A representative area of the structure should beevaluated to determine the surface profile yield before produc-tion abrasive blast cleaning begins so that adjustments to the

  abrasive, equipment or other factors (or the project specifica-tion requirements) can be made.

  C2.5.3 Determining Surface Profile on Pitted Steel:Surface profile readings taken on pitted areas of steel can yieldfalse high values (even with visual techniques). Surface profile

  readings should be obtained from non-pitted areas when thesteel surfaces contain pits. If the steel is 100% pitted, a testpanel should be created to evaluate the surface profile.

  閱讀中文版點擊http://ieqq.cn/

  這些是SSPC標(biāo)準(zhǔn)的原文,今天就先給大家分享這么多,同時鴻鑫鋼丸也感謝大家長久以來的支持。我后續(xù)會把SSPC標(biāo)準(zhǔn)繼續(xù)分享給你們。

  想了解更多鋼丸姐和鴻鑫鋼丸的故事點擊http://ieqq.cn/

  也可以加鋼丸姐的私人微信哦,一般人都不告訴他。。。

上一篇:SSPC-PA17標(biāo)準(zhǔn) B1 B2(中文版) 鴻鑫鋼丸

下一篇:SSPC-PA17標(biāo)準(zhǔn) B3(中文版) 鴻鑫鋼丸

新聞資訊news
聯(lián)系我們contact us

聯(lián)系人:陳經(jīng)理

電話:027-84841595

移動電話:13016427928

傳真:027-84841595

公司地址:武漢市黃陂區(qū)盤龍城28街B4-1

鋼丸姐咨詢熱線

027-84841595

400-038-8928

留言詢價
  • 目前已有人收到了報價表
  • (必填)手機:
  • (必填)稱呼:
  • (選填)填寫詳細(xì)需求:使用場景、產(chǎn)品規(guī)格
目前已有19072人收到了報價表
您的留言將通過郵件、短信、電話的方式通知工作人員3分鐘內(nèi),您將收到回電,請保持電話暢通
主站蜘蛛池模板: 亚洲精品无码久久久久苍井空国产一 | 少妇特黄V一区二区三区 | 男男又爽又黄又无遮挡网站 | 狠狠色狠狠色综合久久 | 久久中文字幕人妻丝袜系列 | 两个人的房间高清在线观看 | 竹菊影视欧美日韩一区二区三区四区五区 | 性少妇videosexfreexxxx片 | 国产综合色在线精品 | 中文人妻无码一区二区三区信息 | 国产10000部拍拍拍免费视频 | tube性老少配bbwcom | 中文字幕久久波多野结衣av不卡 | 亚洲精品综合中文字幕 | 国产精品免费久久久久影院 | 亚洲VA在线VA天堂VA欧美VA | 挺进邻居丰满少妇的身体 | 国产破外女出血视频 | 亚洲AV无码一区二区三区乱子伦 | 在线播放偷拍一区精品小说 | 好男人社区神马WWW在线观看 | 国产女主播视频一区二区三区 | 业余 自由 性别 成熟偷窥 | 亚洲色无码A片一区二区 | 国产精品亚洲欧美日韩一区在线 | 又大又粗又爽的少妇免费视频 | 白浆在线| 把护士强奷到舒服的动态图 | 少妇爆乳无码专区AV无码 | ass鲜嫩鲜嫩pics日本 | 黑人上司与人妻激烈中文字幕 | 6080yy亚洲久久无码 | jizz中国jizz免费 | 国产精品免费高清在线观看 | 美女极度色诱视频国产 | 97碰在线看片免费视频 | 日本熟妇色一本在线看 | 伊人中文字幕无码专区 | 亚洲综合性av私人影院 | 免费看黄在线观看 | 秋霞在线观看片无码免费 |